22 September 2014
We just submit our first project and in the same time we get our second one already.
This time we need to draw natural form and also man-made form. We're brief about the project and then we're required to take a pictures of the form and draw it out. spend quite some time in searching for it as the man-made form has to be found outside the campus!
The submission for this project suppose to be on 29th September but due to our Pimpin Siswa camp is on the 26th,27th and 28th September, the submission date have been postponed to 3 October 2014.
30 September 2014
Just came back from Camp and haven't even start the project. Then went to print the relevant pictures and start drawing border and grid line.
2A : Natural Form
in the process of drawing
close-up. As a quantity surveyor, i'm not good in drawing and i'm not interested in drawing, but after i joined HBP school, i'm forced to draw. Even though at the end, my drawing still doesn't show any improvement but i really do put in effort! I'm proud of myself!
2 October 2014
2B : Man-Made Form
Tomorrow is the deadline and i'm still trying my best to draw the man-made form
Project 2B, Man-made form required us to colour the man-made form!
Pretty hard to draw! As my skill is limited.
The End Product!
2A : Natural Form
2A : Natural Form
2B : Man-Made Form
SUBMISSION DATE : 3 OCTOBER 2014
No comments:
Post a Comment